Skip to main content

TVA Kingston Fossil Fuel Plant Release Site

Go Search
Home
Dredging
Excavation
Disposal
Productivity
Nature and Extent
River Advisory/Closure
Health and Safety
Calendar
Weather
  


 

Nature and Extent Map
(click image to view larger)

 Nature and Extent Documents

Edit
 AerialPhotos042009.jpgAerialPhotos042009
 Approved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee Rivers.pdfApproved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee Rivers
 Revised Dreging Plan July 2009 with attachments.pdfRevised Dreging Plan July 2009 with attachments
 Pre_Flood_Bathymetry.pdfPre_Flood_Bathymetry
 Post_Flood_Bathymetry.pdfPost_Flood_Bathymetry
 Gain_and_Loss.pdfGain_and_Loss
 EPA Sampling Locations (December 23, 2008).pdfEPA Sampling Locations (December 23, 2008)
 Transmittal Cover for Regulatory Submittal -Cenosphere Collection Area Consolidation Work Plan.pdfTransmittal Cover for Regulatory Submittal -Cenosphere Collection Area Consolidation Work Plan
 Transmittal Cover for Regulatory Submittal - Revised Dredging Plan July 2009 Signed Version.pdfTransmittal Cover for Regulatory Submittal - Revised Dredging Plan July 2009 Signed Version
 Weir Bathymetry.jpgWeir Bathymetry
 Ash_Underwater_Phase1B_UTNR_8x11_20090813_r2.pdfAsh_Underwater_Phase1B_UTNR_8x11_20090813_r2
 Ash_Underwater_Phase1B_LTNR_8x11_20090813_r2.pdfAsh_Underwater_Phase1B_LTNR_8x11_20090813_r2
 Ash_Underwater_Phase1B_KEYAREAS_8x11_20090813_r2.pdfAsh_Underwater_Phase1B_KEYAREAS_8x11_20090813_r2
 Ash_Underwater_Phase1B_EMR_8x11_20090813_r2.pdfAsh_Underwater_Phase1B_EMR_8x11_20090813_r2
 Ash_Underwater_Phase1B_CLR_8x11_20090813_r2.pdfAsh_Underwater_Phase1B_CLR_8x11_20090813_r2
 Sub-bottom Profiling Workplan Final.pdfSub-bottom Profiling Workplan Final
 Ash_Sediment_Transects_061709.pdfAsh_Sediment_Transects_061709

 Nature and Extent Links

    TVA: Eckman Dredge Samples and Visual
    TVA: Ash Distribution August 27, 2009