Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) R1.pdf
Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) R1Use SHIFT+ENTER to open the menu (new window).
1/19/2010 6:55 AMDannena Bowman
Addendum to Construction of Lateral Expansion Facilities Phases 1.pdf
Addendum to Construction of Lateral Expansion Facilities Phases 1Use SHIFT+ENTER to open the menu (new window).
12/4/2009 2:31 PMDannena Bowman
approval to move 20 inch dredge to section 4.pdf
approval to move 20 inch dredge to section 4Use SHIFT+ENTER to open the menu (new window).
1/20/2010 12:20 PMDannena Bowman
Approved Action Memorandum.pdf
Approved Action MemorandumUse SHIFT+ENTER to open the menu (new window).
8/5/2009 7:24 AMDannena Bowman
Approved Phase 1 Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in Al, KY and TN.pdf
Approved Phase 1 Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in Al, KY and TNUse SHIFT+ENTER to open the menu (new window).
7/21/2009 8:07 AMDannena Bowman
Approved Revised Temporary Ash Stockpile in the Peninsula Borrow Area Work Plan.pdf
Approved Revised Temporary Ash Stockpile in the Peninsula Borrow Area Work PlanUse SHIFT+ENTER to open the menu (new window).
8/15/2009 7:15 AMDannena Bowman
Approved Site Dust Control and Air Monitoring Plan.pdf
Approved Site Dust Control and Air Monitoring PlanUse SHIFT+ENTER to open the menu (new window).
8/14/2009 2:11 PMDannena Bowman
Approved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee Rivers.pdf
Approved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee RiversUse SHIFT+ENTER to open the menu (new window).
8/25/2009 6:59 PMDannena Bowman
Ash Loading Test Evaluation_052809.pdf
Ash Loading Test Evaluation_052809Use SHIFT+ENTER to open the menu (new window).
6/17/2009 6:38 AMDannena Bowman
Ash Pond Mechanical Dredging Work Plan.pdf
Ash Pond Mechanical Dredging Work PlanUse SHIFT+ENTER to open the menu (new window).
2/17/2010 1:35 PMDannena Bowman
Ball Field Reconfiguration Work Plan.pdf
Ball Field Reconfiguration Work PlanUse SHIFT+ENTER to open the menu (new window).
2/26/2010 7:59 AMDannena Bowman
Construction of lateral expansion facilities - Phase 1 Work Plan.pdf
Construction of lateral expansion facilities - Phase 1 Work PlanUse SHIFT+ENTER to open the menu (new window).
12/4/2009 12:56 PMDannena Bowman
Construction_Operation of Excavation_Working Platform Extended Platform on Lateral Expansion Work Plan .pdf
Construction_Operation of Excavation_Working Platform Extended Platform on Lateral Expansion Work Plan Use SHIFT+ENTER to open the menu (new window).
3/1/2010 10:40 AMDannena Bowman
Data Management Plan Rev_30 Nov 09.pdf
Data Management Plan Rev_30 Nov 09Use SHIFT+ENTER to open the menu (new window).
12/8/2009 12:16 PMDannena Bowman
Dike C Risk  Mitigation Work Plan.pdf
Dike C Risk Mitigation Work PlanUse SHIFT+ENTER to open the menu (new window).
12/4/2009 7:30 AMDannena Bowman
EPA OSC Dredging Determination 3_05_10 FINAL.pdf
EPA OSC Dredging Determination 3_05_10 FINALUse SHIFT+ENTER to open the menu (new window).New
3/9/2010 9:11 AMDannena Bowman
Excavator Salvage Work Plan.pdf
Excavator Salvage Work PlanUse SHIFT+ENTER to open the menu (new window).
11/30/2009 1:56 PMDannena Bowman
Jan. 26, 2010 Public Meeting Time Critical Update Presentation.pdf
Jan. 26, 2010 Public Meeting Time Critical Update PresentationUse SHIFT+ENTER to open the menu (new window).
1/27/2010 5:39 AMDannena Bowman
Lateral Expansion Work Plan with Stantec Stamped Letter and Drawings.pdf
Lateral Expansion Work Plan with Stantec Stamped Letter and DrawingsUse SHIFT+ENTER to open the menu (new window).
12/11/2009 11:02 AMDannena Bowman
Lime Application in Ballfield.pdf
Lime Application in BallfieldUse SHIFT+ENTER to open the menu (new window).
2/9/2010 7:14 AMDannena Bowman
Lime Test Work Plan (approved).pdf
Lime Test Work Plan (approved)Use SHIFT+ENTER to open the menu (new window).
11/13/2009 4:34 AMDannena Bowman
Mechanical Dewatering for Treatment of Ash Pond Fines Work Plan.pdf
Mechanical Dewatering for Treatment of Ash Pond Fines Work PlanUse SHIFT+ENTER to open the menu (new window).
12/11/2009 10:38 AMDannena Bowman
New Sluice Trench Road Work Plan.pdf
New Sluice Trench Road Work PlanUse SHIFT+ENTER to open the menu (new window).
1/13/2010 3:15 PMDannena Bowman
Quality Assurance Project Plan for the TVA Kingston Ash Recovery Project.pdf
Quality Assurance Project Plan for the TVA Kingston Ash Recovery ProjectUse SHIFT+ENTER to open the menu (new window).
12/21/2009 7:57 AMDannena Bowman
Rail Modifications Work Plan.pdf
Rail Modifications Work PlanUse SHIFT+ENTER to open the menu (new window).
12/11/2009 11:04 AMDannena Bowman
Railroad Modificaion Work Plan R1.pdf
Railroad Modificaion Work Plan R1Use SHIFT+ENTER to open the menu (new window).
1/25/2010 5:37 AMDannena Bowman
Relic Area Piezometer Installation Work Plan.pdf
Relic Area Piezometer Installation Work PlanUse SHIFT+ENTER to open the menu (new window).
12/11/2009 1:35 PMDannena Bowman
Revised Dreging Plan July 2009 with attachments.pdf
Revised Dreging Plan July 2009 with attachmentsUse SHIFT+ENTER to open the menu (new window).
8/3/2009 11:17 AMDannena Bowman
Settling Areas 1A_ 2A Maintenance and Clean Out WorkPlan.pdf
Settling Areas 1A_ 2A Maintenance and Clean Out WorkPlanUse SHIFT+ENTER to open the menu (new window).
1/13/2010 3:20 PMDannena Bowman
Settling Basins Maintenance and Clean Out Plan.pdf
Settling Basins Maintenance and Clean Out PlanUse SHIFT+ENTER to open the menu (new window).
11/2/2009 1:29 PMDannena Bowman
Site Acronym List .doc
Site Acronym List Use SHIFT+ENTER to open the menu (new window).
9/14/2009 12:02 PMTommie Jean Valmassy
Site Wide Safety and Health Plan_February 2010_rev 4.pdf
Site Wide Safety and Health Plan_February 2010_rev 4Use SHIFT+ENTER to open the menu (new window).
3/2/2010 7:12 AMDannena Bowman
Skimmer Wall Debris Removal Work Plan.pdf
Skimmer Wall Debris Removal Work PlanUse SHIFT+ENTER to open the menu (new window).
2/26/2010 7:59 AMDannena Bowman
Storm Water Pollution Prevention addendum.pdf
Storm Water Pollution Prevention addendumUse SHIFT+ENTER to open the menu (new window).
11/25/2009 4:54 AMDannena Bowman
Sub-bottom Profiling Workplan Final.pdf
Sub-bottom Profiling Workplan FinalUse SHIFT+ENTER to open the menu (new window).
8/20/2009 1:55 PMDannena Bowman
Test Embankment Buttress Work Plan.pdf
Test Embankment Buttress Work PlanUse SHIFT+ENTER to open the menu (new window).
3/3/2010 1:20 PMDannena Bowman
Time Critical Ash Removal from East Embayment Work Plan (Approved document).pdf
Time Critical Ash Removal from East Embayment Work Plan (Approved document)Use SHIFT+ENTER to open the menu (new window).
11/13/2009 4:34 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Access Channel Construction_Debris Rmvl Ops Work Plan Revised Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Access Channel Construction_Debris Rmvl Ops Work Plan Revised Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:49 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Ash Movement East of Dike 2 Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Ash Movement East of Dike 2 Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:38 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Ash Stacking Height in Processing Area Work Plan Signed Version (Cover Only).pdf
Transmittal Cover for Regulatory Submittal - Ash Stacking Height in Processing Area Work Plan Signed Version (Cover Only)Use SHIFT+ENTER to open the menu (new window).
6/17/2009 6:43 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Clean Water Ditch in the East Embayment Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Clean Water Ditch in the East Embayment Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/22/2009 8:43 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Construction Site Security Plan Approved Version.pdf
Transmittal Cover for Regulatory Submittal - Construction Site Security Plan Approved VersionUse SHIFT+ENTER to open the menu (new window).
8/20/2009 12:59 PMDannena Bowman
Transmittal Cover for Regulatory Submittal - Construction_Implementation of Barge Offloading Area Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Construction_Implementation of Barge Offloading Area Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:39 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Offsite Ash Disposal Options Plan Approved.pdf
Transmittal Cover for Regulatory Submittal - Offsite Ash Disposal Options Plan ApprovedUse SHIFT+ENTER to open the menu (new window).
7/2/2009 8:58 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Rail Car Unloading Operation Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Rail Car Unloading Operation Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:40 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Rail Spur Construction Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Rail Spur Construction Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:41 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Revised Dredging Plan July 2009 Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Revised Dredging Plan July 2009 Signed VersionUse SHIFT+ENTER to open the menu (new window).
8/3/2009 10:59 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Revised Time Critical Land Based Ash Removal East of Dike 2 Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Revised Time Critical Land Based Ash Removal East of Dike 2 Signed VersionUse SHIFT+ENTER to open the menu (new window).
7/2/2009 1:50 PMDannena Bowman
Transmittal Cover for Regulatory Submittal - Rim Ditch Hydraulic Improvments Workplan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Rim Ditch Hydraulic Improvments Workplan Signed VersionUse SHIFT+ENTER to open the menu (new window).
7/14/2009 2:54 PMDannena Bowman
Transmittal Cover for Regulatory Submittal - Rim Ditch Structural Improvements Work Plan - Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Rim Ditch Structural Improvements Work Plan - Signed VersionUse SHIFT+ENTER to open the menu (new window).
7/22/2009 5:57 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Settling Area Work Plan Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Settling Area Work Plan Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:44 AMDannena Bowman
Transmittal Cover for Regulatory Submittal - Site Wide Safety and Health Plan Approved.pdf
Transmittal Cover for Regulatory Submittal - Site Wide Safety and Health Plan ApprovedUse SHIFT+ENTER to open the menu (new window).
7/2/2009 12:52 PMDannena Bowman
Transmittal Cover for Regulatory Submittal - Test Embankment Program with TDEC letters and Stantec Document (part 1).pdf
Transmittal Cover for Regulatory Submittal - Test Embankment Program with TDEC letters and Stantec Document (part 1)Use SHIFT+ENTER to open the menu (new window).
9/18/2009 3:25 PMDannena Bowman
Transmittal Cover for Regulatory Submittal - Wet Ash Storage to Support Time Critical Land Signed Version.pdf
Transmittal Cover for Regulatory Submittal - Wet Ash Storage to Support Time Critical Land Signed VersionUse SHIFT+ENTER to open the menu (new window).
9/17/2009 8:11 AMDannena Bowman
Transmittal Cover for Regulatory Submittal -Approved Site Storm Water Management Plan.pdf
Transmittal Cover for Regulatory Submittal -Approved Site Storm Water Management PlanUse SHIFT+ENTER to open the menu (new window).
6/30/2009 6:33 AMDannena Bowman
Transmittal Cover for Regulatory Submittal -Cenosphere Collection Area Consolidation Work Plan.pdf
Transmittal Cover for Regulatory Submittal -Cenosphere Collection Area Consolidation Work PlanUse SHIFT+ENTER to open the menu (new window).
6/22/2009 8:43 AMDannena Bowman
Transmittal Cover for Regulatory Submittal -Loading Work Plan.pdf
Transmittal Cover for Regulatory Submittal -Loading Work PlanUse SHIFT+ENTER to open the menu (new window).
6/25/2009 10:07 AMDannena Bowman
Transmittal Cover for Regulatory Submittal -Swan Pond Road Construction Entrance Work Plan.pdf
Transmittal Cover for Regulatory Submittal -Swan Pond Road Construction Entrance Work PlanUse SHIFT+ENTER to open the menu (new window).
6/22/2009 8:43 AMDannena Bowman
Transmittal Cover for Regulatory Submittal -Work Plan for Dredge Relocation R0 Signed Version.pdf
Transmittal Cover for Regulatory Submittal -Work Plan for Dredge Relocation R0 Signed VersionUse SHIFT+ENTER to open the menu (new window).
6/17/2009 6:38 AMDannena Bowman
Vehicle Wheel Wash and Decontamination Work Plan.pdf
Vehicle Wheel Wash and Decontamination Work PlanUse SHIFT+ENTER to open the menu (new window).
10/22/2009 12:25 PMDannena Bowman
Weir 1 Removal Work Plan.pdf
Weir 1 Removal Work PlanUse SHIFT+ENTER to open the menu (new window).
3/5/2010 12:13 PMDannena Bowman
    Phase 1 Facility Assessments Link
    EE/CA and Community Involvement Plans (Comment Period October 21, 2009 thru November 20, 2009)
    EPA QAPP Requirements
    Site Wide Health and Safety Plan_February 2010_rev. 4